SmartVisuals Timeline
Events, milestones, eras and swimlanes on one time axis. Labels never overlap. Zoom, icons, keyboard
Events, milestones, eras and swimlanes on one time axis. Bind an Event and its Start - the timeline already reads like a finished slide. Add an End for ranges, a Lane for swimlanes and a Category for colours, shapes and the legend.
EVERYTHING PLACED, NOTHING OVERLAPPING
A collision-free layout stacks labels above and below each line, most important first, and no stem ever runs through another label. Markers that would touch stack apart instead of piling up. Whatever cannot fit is counted in the status strip and comes back as you zoom - never drawn on top of something else, never silently dropped.
YOUR DATA AS IT IS
- Points and ranges in one table: End is optional. An End of "ongoing" (or 9999-12-31) draws a range that runs to today.
- A category named Milestone draws diamonds with guide lines through every lane. Recognised in 20 languages, overridable per category.
- Dates, date-times down to the minute, or whole-number years - negative years are BC. Write c. 1450 for an approximate date.
- Built-in icons (flag, star, rocket, check, alert, team, trophy and more) and embedded images. Web addresses are never loaded: the visual makes no external calls.
- A Link column makes event labels clickable; Power BI asks before the report is left.
READ IT YOUR WAY
Zoom with Ctrl + mouse wheel or the buttons, drag to pan, steer with the overview strip. Shift + drag selects a time range and filters the rest of the report. Open the report on the period you choose. Comfortable or compact density, a today line, up to three labelled reference lines for deadlines and go-lives, descriptions drawn under the labels, a two-row axis from minutes to millennia, and four themes that change the character of the chart, not just its colours. Conditional formatting (fx) on event colours.
BUILT FOR REPORTS
Cross-filtering, cross-highlighting, report-page tooltips and the context menu. Keyboard first: one tab stop, arrow keys move through events and lanes, plus and minus zoom. Screen-reader names for every event, Windows high contrast, an Accessibility card (focus outline, minimum text size, shapes as a non-colour cue) and 20 interface languages - all of it in the free tier.
FREE
Everything above, in up to three swimlanes, in the horizontal layout.
PREMIUM: ROADMAP AND STORY
The free timeline tells the story. Premium runs the review.
- Any number of swimlanes, and lane groups (Group > Lane) the reader can collapse - plant, workstream, team.
- Background eras from a category named Era, Phase or Period, and the vertical layout for long histories.
- Milestone Dates: bind several date columns - one row per project, one column per milestone - and each becomes a named milestone on its project's line. No unpivoting.
- Planned vs actual: a ghost marker at the plan and the slip in days on every milestone - also per milestone column, with each plan matched to its milestone by name. Pending and overdue milestones are flagged and counted first.
- Story mode: step or play through the events, each one zoomed to and explained in a card.
- Gap analysis: days between consecutive events per lane and the longest quiet period marked.
- Axis breaks: collapse empty centuries or quiet years so the busy part gets the room.
Everything previews free in edit mode. Unlicensed viewers always see the free timeline - the first three lanes with a note saying so, in the horizontal layout - never blocked, never watermarked.
Planning tasks with dependencies? Use SmartVisuals Gantt Chart.
Sample report and documentation: smartvisuals.io
Support: hello@smartvisuals.io