https://store-images.s-microsoft.com/image/apps.17841.a05cba99-9eb8-4385-9813-0e5e8b39c52c.888d4ecf-5cf9-4a25-a010-67d8a0fd0528.67d485fc-8a0a-4d4f-bce8-ae8af1438a0e

Power BI pre-deployment analysis: 2-Day Assessment

EBIS SP. Z.O.O.

2-Day Pre-implementation Analysis at the Client's premises completed with documentation of the work carried out, the Power BI implementation plan report and the required system architecture.

The scope of the analysis (2 days of work at the Client’s):

  • 2-day pre-implementation analysis at the Client's premises covering up to 4 areas within company, completed by providing documentation of the work carried out together with the Power BI implementation plan report and the required system architecture.

*the exact schedule of the pre-implementation analysis divided into areas will be agreed with the Client before the implementation date.

Preparation of the Analysis Document (1 day offsite work after the analysis)

  • The work necessary to prepare an Analysis Document based on information collected during the pre-implementation analysis at the Client's.

As part of the Analysis Document, the following will be presented and described:

  • Pre-implementation requirements
  • Implementation stages (areas, models, reports)
  • System architecture
  • Estimated implementation time

Bir bakışta

https://store-images.s-microsoft.com/image/apps.57604.a05cba99-9eb8-4385-9813-0e5e8b39c52c.888d4ecf-5cf9-4a25-a010-67d8a0fd0528.c54f1327-8dc8-48ee-b261-dd2bde0aa412
https://store-images.s-microsoft.com/image/apps.19664.a05cba99-9eb8-4385-9813-0e5e8b39c52c.888d4ecf-5cf9-4a25-a010-67d8a0fd0528.299aa289-fcf8-4ac9-bcdf-57c322a99f7f
https://store-images.s-microsoft.com/image/apps.27040.a05cba99-9eb8-4385-9813-0e5e8b39c52c.888d4ecf-5cf9-4a25-a010-67d8a0fd0528.b73eac29-adb2-476d-953b-64da965d74d1
https://store-images.s-microsoft.com/image/apps.1391.a05cba99-9eb8-4385-9813-0e5e8b39c52c.888d4ecf-5cf9-4a25-a010-67d8a0fd0528.325ed581-3b71-40bc-adb0-01f7eb650d2e