SmartVisuals Gantt Chart
de SmartVisuals.io
Gantt chart with hierarchy, dependencies, critical path and baselines. Core features free.
SmartVisuals Gantt Chart turns Power BI into a real project-tracking tool. Build a schedule with a collapsible work-breakdown hierarchy, watch progress roll up to summary bars, and trace what actually drives your timeline through dependency arrows, critical-path highlighting and plan-vs-actual baselines.
Everything is computed locally inside Power BI. No external services, no API keys, no data leaving your report.
What you get for free
- Parent-child task hierarchy with rollup summary bars and expand/collapse, including one-click collapse all.
- Calendar-aligned two-level time axis with Day/Week/Month zoom and sticky headers that stay in place as you scroll.
- Milestones as diamonds, circles, stars or flags, with progress bars, overdue highlighting and a today line.
- Category color coding with an interactive legend, weekend shading, tooltips and full cross-filtering with the rest of your report.
- Four built-in themes, including the turquoise SmartVisuals look with water-drop milestones, plus report-theme colors and a custom or transparent background.
- Layout control over bar styles, the time-axis header, row and label layout.
Premium features
Per-user license, first month free.
- Dependency arrows - finish-to-start connectors drawn from a simple comma-separated predecessor field. No separate relationship table to model.
- Critical path - the longest chain through your dependency network, highlighted automatically, so you can see which slip actually moves the end date.
- Baseline comparison - ghost bars showing the original plan, with the slip spelled out in the tooltip ("+3 days late").
- Grid columns - up to three sortable data columns beside the task names for Owner, Status, Cost or anything else in your model.
How licensing works
Everything is unlocked while you author or edit a report, so you can build and test the full chart before deciding. Free features always render for every viewer and the visual never blocks your report or shows a watermark. A per-user license is only needed to see premium features in reading view. Licenses are purchased through AppSource and assigned to users in the Microsoft 365 admin center, like any other Microsoft subscription. Additional purchases may be required.
Getting started
Drop in Task, Start Date and End Date and you have a working chart. Add Parent Task for hierarchy, Dependencies for arrows, and Progress %, Baseline Start/End, Category or Grid Columns as your project needs them.
Tip: give a task the same start and end date and it renders as a milestone marker.
Works well for project management of construction schedules, product roadmaps, campaign calendars, implementation plans, portfolio timelines and sprint overviews.
Privacy and security
All calculations, including the critical path, run locally in the browser inside your Power BI report. The visual makes no external service calls, requires no accounts or API keys, and never transmits your data anywhere.
Support and documentation: hello@smartvisuals.io | smartvisuals.io