Skip to main content
Microsoft
separator
https://catalogartifact.azureedge.net/publicartifacts/smartvisuals.smartvisuals-metro-map-636f43ed-d40d-4c78-a317-1b5c60b393ef/image3_icon300.png

SmartVisuals Process Metro Map

by SmartVisuals.io

Free Trial
Download SampleInstructions

How long, not just how many: a process as a metro line, with leg times and late legs flagged.

How long, not just how many. A storytelling view of a process: the funnel and the clock in one picture. Stations are the stages, line width is the traffic, every gap shows who got off, and with Premium how long each leg took, which legs ran late against their target and what changed since last period. Sales, hiring, order to delivery, claims, tickets: a five-second read for the review meeting.

It is a presentation view of an ordered process built from one row per stage, not a process-mining tool: it does not read event logs or discover variants.

Premium: the time story

  • Leg times: bind Time From Previous Stage and every leg carries its time in days, hours, minutes, weeks or months; the end-to-end time is in the last station's tooltip.
  • Target Time (SLA): legs over their target get a clock and the overrun, a dashed works-zone outline and a line in the insight sentence. Never colour alone.
  • Time heat: every leg coloured by its time against the median leg, from quicker to slower, no target needed. The badges keep the numbers.
  • Comparison Volume: last quarter, last year or plan. The change shows at every station with an arrow, the comparison width runs as a casing behind each line, and the insight names the leg whose conversion moved most.
  • The insight sentence: how many reach the end, the biggest drop, the slowest leg, how many legs ran late and the biggest change. Computed offline in your report's number format.
  • Real processes: more than six stages, and several lines. Bind a Line field (channel, product, route) and each value becomes a metro line; shared stages become interchanges, a branch leaves the trunk and rejoins it, an express line bypasses the stations it skips.

Free: one funnel of up to six stages

  • Bind a Stage and a Traffic measure; Stage Order sets the order, otherwise stations order by traffic.
  • The line narrows as traffic leaves. Every drop-off leaves the line as an exit with its count and share; traffic that joins mid-way joins as an entry.
  • Labels at every station: traffic, share of start, share of previous station, or two together. Stations can be numbered.
  • Four themes with their own character, every colour yours, a per-line colour that accepts conditional formatting, moving trains for wall screens and a boardroom mode that shows the same numbers as a plain table.
  • No watermark and no time limit.

Readable at any size

  • Horizontal, vertical or automatic: a tall tile turns the map vertical.
  • A small tile angles the names, then shows every other one, then drops values, before anything overlaps or is cut. A minimum text size can be set.

Built for real reports

  • Click a station to cross-filter, click a line to filter the line, Ctrl+click for several, right-click for the context menu. Highlights from other visuals draw as a bright core inside each line.
  • Tooltips on every station and leg, plus your own tooltip measures. A draw-in when the report opens; export and print always get the finished map.
  • Legend: every line by name and bullet, and the time heat scale, at the top or the bottom.
  • Numbers follow each measure's format, dynamic format strings included.

Accessible, in every tier

  • Keyboard: one tab stop, arrow keys from station to station, Enter to select, Shift+F10 for the menu. Every station is read aloud and screen readers get the full table.
  • Windows high contrast is honoured with a stripe pattern per line; reduced motion is honoured or can be forced. Lines carry bullets with their initials, late legs a clock: nothing depends on colour alone.
  • Accessibility options in the format pane: reduce motion, focus outline colour and width, minimum text size and line patterns.

Free and Premium

Premium is per user, with a one-month free trial. In edit mode every Premium feature can be tried. Viewers without a licence see the free map with a short notice from Power BI, never a blank or watermarked visual: past six stages the first six are shown with a note, and several lines show as their total, or as the main line by name, so one line never passes for the whole pipeline.

Nothing leaves your report: no network calls, no tracking, no external fonts. Sample report with Helios Manufacturing data included. Support: smartvisuals.io/support

Visual capabilities

This visual is certified by Power BI

At a glance

https://catalogartifact.azureedge.net/publicartifacts/smartvisuals.smartvisuals-metro-map-636f43ed-d40d-4c78-a317-1b5c60b393ef/image0_01howlongnotjusthowmany.png
https://catalogartifact.azureedge.net/publicartifacts/smartvisuals.smartvisuals-metro-map-636f43ed-d40d-4c78-a317-1b5c60b393ef/image1_02timeheat.png
https://catalogartifact.azureedge.net/publicartifacts/smartvisuals.smartvisuals-metro-map-636f43ed-d40d-4c78-a317-1b5c60b393ef/image4_03latelegsandwhatchanged.png
https://catalogartifact.azureedge.net/publicartifacts/smartvisuals.smartvisuals-metro-map-636f43ed-d40d-4c78-a317-1b5c60b393ef/image5_04freefunnel.png
https://catalogartifact.azureedge.net/publicartifacts/smartvisuals.smartvisuals-metro-map-636f43ed-d40d-4c78-a317-1b5c60b393ef/image2_05accessible.png
English (United States)
Your Privacy Choices Opt-Out Icon Your Privacy Choices
Consumer Health Privacy Sitemap Contact Us Privacy & Cookies Terms of Use About our ads Manage cookies