تخطي إلى المحتوى الرئيسي
Microsoft
separator
https://store-images.s-microsoft.com/image/apps.43346.785348c8-1472-49ee-9de3-e1fb9121452a.56477bd6-b4cc-4860-9c4a-8a8a57429ebb.be81fcf2-688c-443b-acfb-3570e4ba5763

Disaster Recovery: 2-Week Implementation

Catapult Systems, LLC

This engagement will be successful when:

  1. A high-level Disaster Recovery design and recovery plan is accepted by the client.
  2. Deployment of the selected DR solution is tested.
  3. Knowledge transfer of solution over to client’s team is completed.

Week 1

  • Envisioning sessions to define cloud DR scenarios, objectives and requirements
  • Planning sessions (3 x 2 hours) to define DR architecture, recovery process, and connectivity with follow ups as needed
  • Setup and provision cloud infrastructure and connectivity, including VPN gateway, storage, virtual network, and security setup
  • Setup of on-premises resources and VM(s) to support DR solution

Week 2

  • Deployment of DR solution and replicate data to Azure over a period of time.
  • Remediation of workloads and VMs for Azure and DR solution compatibility
  • Conduct knowledge transfer and training session (1 x 4 hours) to client’s team

لمحة سريعة

https://store-images.s-microsoft.com/image/apps.60285.785348c8-1472-49ee-9de3-e1fb9121452a.56477bd6-b4cc-4860-9c4a-8a8a57429ebb.8383c011-4456-4259-9eae-77f656f91c90
العربية (ليبيا)
أيقونة إلغاء الاشتراك في اختيارات خصوصيتك خيارات خصوصيتك
خصوصية صحة المستهلك خريطة الموقع اتصل بنا الخصوصية وملفات تعريف الارتباط شروط الاستخدام حول إعلاناتنا إدارة ملفات تعريف الارتباط